Showalter Middle School $19,850,039

Project Scope:

Demolition of 1 story classroom building and replacement with 2 story classroom building 19,993 SF, commons area addition at 2,008 SF and addition to gym at 2,256 SF. Replacement of carpet tile at existing classrooms, mechanical equipment upgrades, fire alarm upgrades. Addition of secure vestibule entry and storm water detention improvements.  Alternates include: Standby generator. 3 temporary portables.

Project Phasing:

Showalter Middle School will continue to be occupied during school year. 

  • Phase 1 – Spring 2019 Preliminary site work, before school is out. 
  • Phase 2 – Summer 2019 work
    • Demolish Building B
    • Work on Commons, Gym, Storm Water, and replace fire alarm panel
  • Phase 3 – During School - Commons Completed by 3-27-2020. 
  • Phase 4 – During School - Ongoing work.
  • Phase 5 – Project Complete 8-15-2020.

School Fence and Occupant Flow Plan

Click here to view the site fencing and occupant flow plan for Showalter Middle School.

Area Additions

  • Add Second Floor Level to Area B (Vocation Building)     
  • Expand the existing Student Commons space
  • Expand the existing Gymnasium space

Remodel Existing Space

  • Remodel First Floor of Area B (Steam Building)

Systems Upgrades/Replacements

  • Replace flooring
  • Replace aged roof-top air-handling units
  • Upgrade air distribution ductwork to enhance air circulation and indoor air quality
  • Upgrade the air distribution control system
  • Replace boilers
     

Showalter Middle School Construction Project Pictures


Timeline Workplan

Showalter Middle School timeline workplan